Drip edge varies in dimensions but typically the flange that nails to the roof surface is about 2 5 wide and the vertical edge that directs roof runoff down and away is about 1 5 in depth.
How far should metal roof hangover drip edge.
Don t overdo the overhang shingles that extend more than 3 4 inch can eventually bend and fracture leaving the roof sheathing and fascia vulnerable to water damage.
The length of the overhang itself commonly ranges from 2 to 5 inches.
However if they used an l type metal flashing or no flashing at all then the starter course and the shingles must be extended beyond the perimeter eve and rake edges 1 4 to 3 4 inch.
Metal is usually installed on rafters or strip sheathing rather than the solid decking used under other materials.
In my opinion the felt underlayment should also extend beyond the drip edge by 1 4 to 1 2 inch.
A drip edge has to be resistant to possible corrosion and should be 36 gauge or larger.
Too little can allow water to seep into rake or fascia boards.
A typical metal roof overhang may be 2 to 4 inches or even less.
Too much overhang and the shingles could blow off in high winds.
Roof drip edges are generally sold in 10 5 foot lengths but they are occasionally sold in 8 foot lengths or smaller.
If you are not using drip edge make the over hang 3 4 then also on page 2 1st course paragraph reads make tabs lie flush with the edges of the starter course i find that by installing 1 instead of 3 4 it compensates for wavy fascia as you said but also if the roofers make a 1 4 mistake it s better to be a wee bit too much than a wee bit too little.
Tape measure hammer pencil ladder small roofing nails tin snips before you start the installation remove all dirt and debris from the roof and take the measurements of the exterior edges to determine how much drip.
Hi if the roofer used an extended drip edge flashing the shingles should be even with the outer edge of the perimeter of the dripedge.