Also you ll need the horizontal distance between the peak and the edge of the high side of the pipe see figure 1 where you plan your roof penetration.
How far should a c pipe be from roof.
In canada the national plumbing code requires that the minimum trap arm be at least 2 times the pipe diameter e g 1 25 inch pipe needs a 2 5 inch trap arm 1 5 pipe needs a 3 inch trap arm etc and that the vent pipe be one size larger than the drain that it serves also a cleanout is required on both the vent and the drain.
Does anyone know what legal height requirements there are for vent pipes or as long as it sticks out of the roof its all sweet.
My understanding is that the chimney should be at least 2 feet higher than any part of the roof within 10 feet of the chimney.
The code requires a 10 foot horizontal distance from any.
6 12 minimum chimney height.
8 12 minimum chimney height.
Roof pitch is easily calculated and if you don t know how read my article understanding and calculating roof pitch.
I guess then from what i ve read here the vent should be minimum of 600mm high.
Obviously look to take out the palm trees to the west as well.
Purlins are 2 by 4 feet and are installed much like metal roofing.
The top of a chimney pipe must extend at least 2 feet above the peak of the roof if the pipe is within 10 feet of the peak.
They are installed on top of the roof rafters with a felt underlayment or vapor barrier installed on top.
Additionally the vent runs up the wall just outside the back door so the vent is also within 3m of the door.
I figured i could shorten the vent pipe and maybe leave a panel out directly south of the pipe and enough room on the sides so the shadow does not hit any of the panels.
In your situation the minimum height of your chimney above the eaves should be the following depending on your roof pitch.
Thanks for the suggestions.
Metal roof purlins are installed horizontally under metal roofs.
First you ll need to know the pitch of your roof.
They give added support to the roof and also provide a nailing surface for the end panels and drip edge.
The vent opening must be far enough above the roof and away from doors and windows to prevent the sewer gases from drifting into the house.
6 minimum or 6 higher than snow accumulation for the geographic area.