Install offset cleat install the offset cleat along the eave and then you are ready to install the metal.
How do you lay sheet metal.
These dimensions may seem helpful but after your manufacturer makes bend deductions based on their capabilities and other bending factors your dimensions will become unusable.
Installing a layer of sheathing like plywood over the furring strips will give you an even insulated surface to work on.
Tape the sheet metal and secure it in place.
Clamp the sheet metal against your desk to hold it in place while you work.
Installing metal roofing panels.
Choose sheathing that s no more than 1 inch 2 5 cm thick so you re not building too far out from the wall.
The cone has a diameter at the top smaller than the diameter at the bottom and to accurately trace the shape onto sheet metal you need to make a template out of construction paper.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Apply masking tape to both sides of the sheet metal directly over the line you want to make.
Simply cut the material to size and nail it to the furring strips so the entire surface is covered.
Place the first screw.
Installing metal roofing panels youtube.
Hidden fastener installation step 1.
If playback doesn t begin shortly try restarting your.
This ensures a cleaner cut and prevents metal chips from scratching the sheet while you cut.