Dexterous hot mop is a professional hot hop company located in rancho cucamonga ca specializing in hot mopping shower waterproofing more.
Hot mop process for roof garden.
When the time comes to re roof your home the hot mop option is a common one.
To install hot mop roofing roofers lay a synthetic base layer top it with a felt layer then pour liquid tar on the roof and spread this sealing compound with a mop which gives the process its name.
You can apply hot mop roofing over old hot mopped roofing or as the first roof on the deck.
Basically asphalt blocks are melted into a cauldron or bucket once melted it is poured onto the roof and a team of installers will mop it into place.
To install torch down roofing roofers roll out sheets of a bitumen containing material.
The hot mop roof bur installation job can be completed within 2 to 4 days depending on the size of the roof and the number of installer we ve put on the job.
They are designed for roofs with shallow pitches where the rise is no more than 4 inches in every 12 inches.
Applying the hot mop in progress is the second step to a general re roofing process acting as a secondary barrier between dry materials and tiles.
Hot mopped asphalt is applied at approximately 400 degrees fahrenheit.
Call 909 917 4100 today.
The hot asphalt is laid out evenly with a large heated mop over the surface.
Ability to cover unusually shaped roofs.
To begin the hot mop process a layer of hot asphalt will be spread on top of the roof s base sheet.
When applying it as the first roof a base sheet is used to protect the raw wood surface.
The heat of the asphalt can easily burn the installers so additional care has to be taken during the installation process.
The asphalt is applied to the roof using a heated mop.
Hot mop takes a lesser level of skill to apply or repair but generally has the shortest life physical wind blown debris or surface abrasion damage aside.
Hot mop roof basics.
Hot mopped roofs are durable low cost options compared with others types of roofs.
The installation of a hot mop roof is a messy experience.
Hot mop also does not tend to have catastrophic initial leaks as often usually they start as small leaks that can be detected by thermal ir camera early on.
A roofing secret that is gaining some serious traction is self adhered underlayments aka peel and stick.
This is great news especially because the average tile roof will take anywhere between a week to up to 10 days to be completely installed.
It serves to protect the base sheet on your roof and keep it watertight.
It involves spreading a layer of hot asphalt on the base layer of the roof.
Though hot mop installations were the methods of choice thru about 15 years ago self adhered systems are now proving to be the superior underlayment solution.