A connection between a vent pipe and a vent stack or stack vent shall be made at not less than 6 inches 152 mm above the flood level rim of the highest fixture served by the vent.
Hight of vent pipe above roof park county colorado.
Park county residential inspection checklist inspection line.
Horizontal vent pipes forming branch vents relief vents or loop vents shall be located not less than 6 inches 152 mm above the flood level rim of the highest.
A reduction in maximum length of 2 5 feet for each 45 degree bend and 5 feet for each 90 degree bend shall apply.
The vent is supposed to be 10 away or 2 above any window.
A vent terminal and depending if the roof is strictly for weather protection it terminates about 24 above the roof.
You must also consider the snow line so the pipe does not get covered.
The maximum length of a 4 inch 102 mm diameter exhaust vent shall not exceed 35 feet 7620 mm from the dryer location to wall or roof termination and shall terminate with a full opening exhaust hood.
719 836 4257 please have permit ready.
Permits initiated before february 1 will stay under 2015 code requirements.
That means that when there is mechanical equipment on the roof sun decks you name it the plumbing vents need to extend up above the roof 7 feet.
Residential dwelling and residential accessory structure s building projectare required to be inspected at various stages of construction.
Open vent pipes that extend through a roof shall be terminated at least 6 inches 152 mm above the roof or 6 inches 152 mm above the anticipated snow accumulation whichever is greater except that where a roof is to be used for any purpose other than weather protection the vent extension shall be run at least 7 feet 2134 mm above the roof.
All open vent pipes that extend through a roof shall be terminated at least 6 inches 152 mm above the roof and not less than 2 inches 51 mm above the invert of the emergency overflow except that where a roof is to be used for any purpose other than weather protection the vent extensions shall be run at least 7 feet 2134 mm above the roof.
You should be able to cut that vent shorter but stay above the roof line.
I am sure the plumber put it at that height for the inspector.
The following is a list of the inspections in the general order that they occur and some of.